Sunday 5 February 2012

Week 5

Week: 30 Jan 2012 - 5 Feb 2012


This week is the deadline for Unit 21 Assignment 2, fortunately I completed my all my wire frames by 03/02/2012 which helped as I had a little time to revisit my design to make sure that all was in order. I had more time due to my project plan stating the finish date should be on the 06/02/2012 and I finished on 03/02/2012, this means I have three extra days to make sure everything is all in order. THis further meant I was ahead of shedual when looking over the project plan at this point in the project.In the end I had a completed initial and final wire frames submitted on time when compared and looked at the project plan on the 06/02/2012. In other words this means in doing so I have met a deadline stated clearly displayed on the project plan displaying I have a met a deadline that cross referenced my project plan. The result of this was that I am able to continue on with the project. By completing this on time I have a firm foundation and of what my website will look feel like and how it will operate. Up to this point I feel my progress has generally been positive as it have not missed the deadline for the wire frames and not fallen being in my project plane as it states that I am on track.