Interim Review
To view the actual Interim Review notes where everything was noted down click here
As a group Me (Mohammed) Rami and
Sam sat together as a group for about fifteen to twenty minutes for an interim
review. By doing this we were able to get up to date of what going on in the
project in terms of our progress, meeting deadlines and any problems we have
faced. In doing this we have a better understand of where we are up to in the
project and stuff that needs to be undertaken as well as understand what is
done in correlation with our progress. We first of all went over all of our progress
through the duration of the project from the start of the project. The sort of
points that we got back from us was that we were generally up to date and haven’t
fallen behind with reference to our project plan. In addition by being up to
date we had all the design completed on time before the designated time as
stated in the interim review bullet points this included our completed 5
initial and 5 final wireframes. However a problem we encountered was that Sam
wasn’t in one day which meant we could tell him a feature we wanted to add into
out site. On the other hand this worked out not to be such a big problem as it
was first though out to be, this because we were able to phone up Sam and let
him know what we wanted to add to our site. From this review we all decided
that we will have another review session before our presentation to client. If
there are any more things we need to work on we will complete it on the second
review day so its ready for the presentation.