Week: 16 April 2012 - 22 April 2012
This week we have returned to college from the Easter holidays. We continued to create the website while at the same time we had submitted the M6 criteria to our teacher for it to be marked and ticked off. Also we were thought how to create forms in our site, i was able to successfully make a log in form which i can use in my website and make choices for the registration part of site. Looking over my project plan I am up to date as I am well before the planned deadline i have set.
Friday, 20 April 2012
Monday, 16 April 2012
Interim Review
Interim Review
To view the actual Interim Review notes where everything was noted down click here
As a group Me (Mohammed) Rami and
Sam sat together as a group for about fifteen to twenty minutes for an interim
review. By doing this we were able to get up to date of what going on in the
project in terms of our progress, meeting deadlines and any problems we have
faced. In doing this we have a better understand of where we are up to in the
project and stuff that needs to be undertaken as well as understand what is
done in correlation with our progress. We first of all went over all of our progress
through the duration of the project from the start of the project. The sort of
points that we got back from us was that we were generally up to date and haven’t
fallen behind with reference to our project plan. In addition by being up to
date we had all the design completed on time before the designated time as
stated in the interim review bullet points this included our completed 5
initial and 5 final wireframes. However a problem we encountered was that Sam
wasn’t in one day which meant we could tell him a feature we wanted to add into
out site. On the other hand this worked out not to be such a big problem as it
was first though out to be, this because we were able to phone up Sam and let
him know what we wanted to add to our site. From this review we all decided
that we will have another review session before our presentation to client. If
there are any more things we need to work on we will complete it on the second
review day so its ready for the presentation.
Week 15
Week: 9 April 2012 - 15 April 2012
This is the second and final week of the Easter holidays and I am still continuing in creating my site and I feel i am making good progress as I haven't fallen behind when looking over my project plan. In addition I have done a write up of the group interim review which too place on 6/04/2012, in doing this I have gained a greater insight of how the group is progressing up to this point in the project and future task that need to be undertaken. I did encounter a small problem which was that i could not put my interim review notes and write up on blogger, this is because blogger wasn't loading up. However this wasn't such a big problem as i waited for a couple of days and then i uploaded the interim review to to my blogger.
This is the second and final week of the Easter holidays and I am still continuing in creating my site and I feel i am making good progress as I haven't fallen behind when looking over my project plan. In addition I have done a write up of the group interim review which too place on 6/04/2012, in doing this I have gained a greater insight of how the group is progressing up to this point in the project and future task that need to be undertaken. I did encounter a small problem which was that i could not put my interim review notes and write up on blogger, this is because blogger wasn't loading up. However this wasn't such a big problem as i waited for a couple of days and then i uploaded the interim review to to my blogger.