Sunday, 8 April 2012

Week 14

Week: 2 April 2012 - 8 April 2012

I have started to create my website from scratch. This was made possible as i have the appropiate package in the form of komodo edit to create the actual website. This week I have manged to make the template of the webpages which gives me clear vision of how the web pages look like.

At the same time on the 06/04/2012 we met as a group to have a planned interim review that we needed to do, this is where we checked our progress at the moment to see if we are up to date and where we should be in the future of the project. We also in this interim review set down "goals" that we wanted to achieve so when we do another interim review which is the day before presentation. Because of this I had made changes to my project plan specifically I had taken a day off the planned testing and using that day for a second interim review in order for us to have a chance to review and discuss what has happened. In doing this I have met a deadline stated clearly displayed on the project plan displaying I have a met a deadline that cross referenced my project plan. Which demonstrable me meeting s review date when cross referenced with my project plan. When checking this week to my project plan i can see i am up to date and on track to meet the finish date I have planned for the implementation of the website.In doing this I have met a deadline which I have set. When looking at my project plan I am able to see that i am on track to meet my deadline for the implementation which is a good thing as I haven't fallen behind menaing im not rushing things. 


Sunday, 5 February 2012

Week 5

Week: 30 Jan 2012 - 5 Feb 2012


This week is the deadline for Unit 21 Assignment 2, fortunately I completed my all my wire frames by 03/02/2012 which helped as I had a little time to revisit my design to make sure that all was in order. I had more time due to my project plan stating the finish date should be on the 06/02/2012 and I finished on 03/02/2012, this means I have three extra days to make sure everything is all in order. THis further meant I was ahead of shedual when looking over the project plan at this point in the project.In the end I had a completed initial and final wire frames submitted on time when compared and looked at the project plan on the 06/02/2012. In other words this means in doing so I have met a deadline stated clearly displayed on the project plan displaying I have a met a deadline that cross referenced my project plan. The result of this was that I am able to continue on with the project. By completing this on time I have a firm foundation and of what my website will look feel like and how it will operate. Up to this point I feel my progress has generally been positive as it have not missed the deadline for the wire frames and not fallen being in my project plane as it states that I am on track. 

Sunday, 29 January 2012

Week 4

Week: 23 Jan 2012 - 29 Jan 2012


This week I have completed the first part of my design which included my draft and final navigation diagrams by the 23/01/2012. This means in doing so I have met a deadline stated clearly displayed on the project plan displaying I have a met a deadline that cross referenced my project plan. After this I have now moved onto the wire frame design section and it tasks. According to my project plan I am on track meaning I have not fallen behind. This is because in my project plan all my wire frame and navigation design all had to be completed by 06/02/2012 and I am well before the deadline date.

Additionally when looking at my project plan when checking my progress up to this week I noticed I had missed a important task of 'Website Sign Off', when discovering this I made a change to the project plan by inserting a new task and named it Website Sign Off which is an extra task my group needed to take in the project. Once this was done my dates changed for the other tasks specifically the Project Evaluation and End project and had to correct this. Because of this my end project date went beyond the date it had to be which was 01/06/2012, to counter act this I reduced the amount of days needed for the design of my site  (even though there is a deadline for this was 03/02/2012). Making these changes didn't cause me much trouble which meant it didn't affect my project plan and no further changes would be needed due to how quickly the changes took. Also I fortunately completed my all my navigation by 23/01/2012 which helped as I have met a deadline I have set for myself on the project plan which then allowed me to continue and start on the draft and final wire frames for my website. In the end I had a completed initial and final navigation submitted on time when compared and looked at the project plan on the 23/01/2012. 


Here is the link to my changed project plan due to  certain circumstances . Click here