Friday, 20 April 2012

Week 16

Week: 16 April 2012 - 22 April 2012


This week we have returned to college from the Easter holidays. We continued to create the website while at the same time we had submitted the M6 criteria to our teacher for it to be marked and ticked off. Also we were thought how to create forms in our site, i was able to successfully make a log in form which i can use in my website and make choices for the registration part of site. Looking over my project plan I am up to date as I am well before the planned deadline i have set.

Monday, 16 April 2012

Interim Review


Interim Review

To view the actual Interim Review notes where everything was noted down click here

As a group Me (Mohammed) Rami and Sam sat together as a group for about fifteen to twenty minutes for an interim review. By doing this we were able to get up to date of what going on in the project in terms of our progress, meeting deadlines and any problems we have faced. In doing this we have a better understand of where we are up to in the project and stuff that needs to be undertaken as well as understand what is done in correlation with our progress. We first of all went over all of our progress through the duration of the project from the start of the project. The sort of points that we got back from us was that we were generally up to date and haven’t fallen behind with reference to our project plan. In addition by being up to date we had all the design completed on time before the designated time as stated in the interim review bullet points this included our completed 5 initial and 5 final wireframes. However a problem we encountered was that Sam wasn’t in one day which meant we could tell him a feature we wanted to add into out site. On the other hand this worked out not to be such a big problem as it was first though out to be, this because we were able to phone up Sam and let him know what we wanted to add to our site. From this review we all decided that we will have another review session before our presentation to client. If there are any more things we need to work on we will complete it on the second review day so its ready for the presentation.

Week 15

Week: 9 April 2012 - 15 April 2012


This is the second and final week of the Easter holidays and I am still continuing in creating my site and I feel i am making good progress as I haven't fallen behind when looking over my project plan. In addition I have done a write up of the group interim review which too place on 6/04/2012, in doing this I have gained a greater insight of how the group is progressing up to this point in the project and future task that need to be undertaken. I did encounter a small problem which was that i could not put my interim review notes and write up on blogger, this is because blogger wasn't loading up. However this wasn't such a big problem as i waited for a couple of days and then i uploaded the interim review to to my blogger.

Sunday, 8 April 2012

Week 14

Week: 2 April 2012 - 8 April 2012

I have started to create my website from scratch. This was made possible as i have the appropiate package in the form of komodo edit to create the actual website. This week I have manged to make the template of the webpages which gives me clear vision of how the web pages look like.

At the same time on the 06/04/2012 we met as a group to have a planned interim review that we needed to do, this is where we checked our progress at the moment to see if we are up to date and where we should be in the future of the project. We also in this interim review set down "goals" that we wanted to achieve so when we do another interim review which is the day before presentation. Because of this I had made changes to my project plan specifically I had taken a day off the planned testing and using that day for a second interim review in order for us to have a chance to review and discuss what has happened. In doing this I have met a deadline stated clearly displayed on the project plan displaying I have a met a deadline that cross referenced my project plan. Which demonstrable me meeting s review date when cross referenced with my project plan. When checking this week to my project plan i can see i am up to date and on track to meet the finish date I have planned for the implementation of the website.In doing this I have met a deadline which I have set. When looking at my project plan I am able to see that i am on track to meet my deadline for the implementation which is a good thing as I haven't fallen behind menaing im not rushing things. 


Monday, 2 April 2012

Week 13

Week: 26 March 2012 - 1 April 2012


The week we finished off completing out practice three column webpage, I was able to come up with a very professional looking website which gave me encouragement that I have  what it takes to make a successful and professional looking website. After this I started straight away in implementing my real website. My progess is again all good and on track to meet dealines that I have set in the project plan.


Click here to see the changes I have made on my project plan.

Sunday, 25 March 2012

Week 12

Week: 19 March 2012 - 25 March 2012


This week we continue being taught how to make the layout for the for a website on komodo edit. We continued making a two column, once completing that and understanding it we moved onto making a three column site on komodo edit. Looking over my project plan i can 'see im up to date and 'im not fallen behind which is a relief as we are fast approaching the ending of the project which is very important.

Sunday, 18 March 2012

Week 11

Week: 12 March 2012 - 18 March 2012


This week we were taught how to make the layout for the for a website on komodo edit. We first started making a one column, once completing that and understanding it we moved onto making a two comlum site on komodo edit. looking over my project plan i can 'see im up to date and 'im not fallen behind which is a relief as we are fast approaching the ending of the project 

Saturday, 10 March 2012

Week 10

Week: 5 March 2012 - 11 March 2012

This week has been an unusual week as blogger wasn't working on the computers we used all week in the sense of  not loading up the profile. This has resulted in the teacher not being able to see my conclusion for unit 21 assignment 2, however this was resolved by us being relocated to another room which had a working blogger site that loaded our blog profile.

Monday, 5 March 2012

Week 9

Week: 27 Feb 2012 - 4 March 2012


This week I have been going back and revising over the css and html on komodo edit so I can refresh my memory of doing. This has been successful as I know feel comfortable to go on and create our website for the project. Up to this point i feel my project is going well as i haven't fallen behind which has meant that i didn't need to change my project plan as i'm on track. Also we were given back our assignment for the design a website and fortunately I achieved all criteria which mean extra time wont be need as i have achieved everything which is a good relief for me.